PROJECT DETAILS
Client
Manchester United FC
Role
Acting as CDM Coordinator
PROJECT VALUE
MUFC EAST STAND EXECUTIVE BOXES
Refurbishment works to the existing executive boxes impacting the East Stand Level 3 corridor and seating within the stadium bowl. A challenging project to create new brand standard boxes along the east stand corridor which is one of the main arteries of the stadium. The management of site logistics and interface with existing operations was key to the success of this project.